Track record
Assignments delivered,
with evidence.
Three documented assignments in the energy sector, for a developer and international consultancies. Filter by assignment type or framework.
- Client
- RSK Environment (Kenya) Ltd
- End client
- Impact Fund Denmark
- Period
- Jun – Aug 2026
Impact, environmental and social due diligence (IESDD) of Weza Power in Burundi
For RSK Environment (Kenya) and Impact Fund Denmark — IFC PS 1 and PS 3, World Bank ESS.
Assignment details
- Review of the company’s policies and procedures; gaps recorded in the document review tracker.
- Poverty and tariff analysis: poverty lines, institutional and legal framework for tariff-setting, connection cost and share of the electricity bill in poor households’ income.
- Joint field visit of approximately six days at the head office and selected pilot sites.
- Inputs to the ESDD report, the E&S action plan (ESAP) and the Red Flags report.
RSK sub-consultancy agreement ref. RSK/KE/2090041/JG/01 of 25 June 2026.
- Client
- SRK Consulting (South Africa)
- End client
- Tembo Power Holdings
- Period
- Nov 2024 – 2025
Support to the supplementary ESIAs of the Dama and Sigu hydropower plants
Dama (9.6 MW, Rumonge) and Sigu (12.4 MW, Bururi) — for SRK Consulting (South Africa) and Tembo Power Holdings, IFC standards.
Assignment details
- Participation in the environmental and social teams of the reconnaissance mission.
- Gap analysis and stakeholder engagement scoping.
- Indigenous Peoples screening (Batwa communities) in the Sigu project area, by the firm’s social anthropologist.
- Organization of meetings with commune administrations, English–French interpretation and advice on consultation protocols in Burundi.
SRK appointment letter No. 609914/JG-01 of 21 November 2024 · SRK reference letter of 5 September 2025.
- Developer
- EnSmart International
- Contract
- 22 May 2023
- Footprint
- ≈ 10 km², state land
ESIA for the 500 MW Bunyuro solar photovoltaic plant — preliminary phase
Gisuru and Ruyigi communes, Ruyigi province (footprint ≈ 10 km²) — for EnSmart International.
Assignment details
- Technical project description and baseline of the physical, biological and human environments.
- Analysis of the policy, legal and institutional framework, including gender and GBV; analysis of alternatives.
- Impact identification and assessment; environmental and social management plan.
- Public and participatory consultation, certified by the Gisuru and Ruyigi communes; non-technical summary in French and English.
Final ESIA report · certificate of satisfactory completion issued by EnSmart International (2024).

What our clients attest
“Their contribution has been highly professional, demonstrating strong logistical coordination, cultural understanding, and technical support.”SRK Consulting (South Africa) — reference letter dated 5 September 2025
Requirements addressed
Frameworks applied, assignment by assignment.
| Reference | Environmental Code | IFC Performance Standards | World Bank ESS | Stakeholder consultation | Vulnerable groups / Indigenous Peoples |
|---|---|---|---|---|---|
| 01 · Weza Power (RSK) | ✓ | ✓ | ✓ | ||
| 02 · Dama and Sigu (SRK) | ✓ | ✓ | ✓ | ||
| 03 · Bunyuro solar plant | ✓ | ✓ |
First conversation
Your project starts with a well-defined need.
Send us your terms of reference, available documents, sites and deadline. We will respond with a technical and financial proposal setting out scope, team, schedule and deliverables.
Jonas NDUWIMANA
Managing Director
info@joygroup.biBld. Patrice Lumumba, Alpha Kilo Building, 2nd floor, 11 C2, Bujumbura, Burundi