Track record

Assignments delivered,
with evidence.

Three documented assignments in the energy sector, for a developer and international consultancies. Filter by assignment type or framework.

01
Client
RSK Environment (Kenya) Ltd
End client
Impact Fund Denmark
Period
Jun – Aug 2026

Impact, environmental and social due diligence (IESDD) of Weza Power in Burundi

IFC PS 1 · PS 3World Bank ESSElectricity access

For RSK Environment (Kenya) and Impact Fund Denmark — IFC PS 1 and PS 3, World Bank ESS.

Assignment details
  • Review of the company’s policies and procedures; gaps recorded in the document review tracker.
  • Poverty and tariff analysis: poverty lines, institutional and legal framework for tariff-setting, connection cost and share of the electricity bill in poor households’ income.
  • Joint field visit of approximately six days at the head office and selected pilot sites.
  • Inputs to the ESDD report, the E&S action plan (ESAP) and the Red Flags report.

RSK sub-consultancy agreement ref. RSK/KE/2090041/JG/01 of 25 June 2026.

02
Client
SRK Consulting (South Africa)
End client
Tembo Power Holdings
Period
Nov 2024 – 2025

Support to the supplementary ESIAs of the Dama and Sigu hydropower plants

IFC Performance StandardsDama 9.6 MW · RumongeSigu 12.4 MW · BururiPS 7 — Batwa

Dama (9.6 MW, Rumonge) and Sigu (12.4 MW, Bururi) — for SRK Consulting (South Africa) and Tembo Power Holdings, IFC standards.

Assignment details
  • Participation in the environmental and social teams of the reconnaissance mission.
  • Gap analysis and stakeholder engagement scoping.
  • Indigenous Peoples screening (Batwa communities) in the Sigu project area, by the firm’s social anthropologist.
  • Organization of meetings with commune administrations, English–French interpretation and advice on consultation protocols in Burundi.

SRK appointment letter No. 609914/JG-01 of 21 November 2024 · SRK reference letter of 5 September 2025.

03
Developer
EnSmart International
Contract
22 May 2023
Footprint
≈ 10 km², state land

ESIA for the 500 MW Bunyuro solar photovoltaic plant — preliminary phase

ESIASolar energyGisuru and Ruyigi communes

Gisuru and Ruyigi communes, Ruyigi province (footprint ≈ 10 km²) — for EnSmart International.

Assignment details
  • Technical project description and baseline of the physical, biological and human environments.
  • Analysis of the policy, legal and institutional framework, including gender and GBV; analysis of alternatives.
  • Impact identification and assessment; environmental and social management plan.
  • Public and participatory consultation, certified by the Gisuru and Ruyigi communes; non-technical summary in French and English.

Final ESIA report · certificate of satisfactory completion issued by EnSmart International (2024).

Illustration: run-of-river hydropower plant and developed marshland

What our clients attest

“Their contribution has been highly professional, demonstrating strong logistical coordination, cultural understanding, and technical support.”SRK Consulting (South Africa) — reference letter dated 5 September 2025

Requirements addressed

Frameworks applied, assignment by assignment.

ReferenceEnvironmental CodeIFC Performance StandardsWorld Bank ESSStakeholder consultationVulnerable groups / Indigenous Peoples
01 · Weza Power (RSK)✓✓✓
02 · Dama and Sigu (SRK)✓✓✓
03 · Bunyuro solar plant✓✓

First conversation

Your project starts with a well-defined need.

Send us your terms of reference, available documents, sites and deadline. We will respond with a technical and financial proposal setting out scope, team, schedule and deliverables.

Jonas NDUWIMANA

Managing Director

info@joygroup.bi

+25762099672

Bld. Patrice Lumumba, Alpha Kilo Building, 2nd floor, 11 C2, Bujumbura, Burundi

Scroll to Top